Railroad track, Täsch / Zermatt


Location
Täsch-Zermatt
Execution period
November 2024
Client
Rovina + Partner AG / Matterhorn Gotthard Bahn
Drillings
10 pcs | ⌀ 200 mm
Depth
3 m
Subsoil
Track ballast
Particular challenges
Working on the track / night work

For the exploration of the railway embankment, exploratory boreholes were drilled from the railway track. To facilitate this, our drilling equipment was lifted onto a railcar. For safety reasons, Adrian and Andrzej conducted the drilling at night.